Load-following capability
Nuclear power plants are essentially base-load generators, ideally running continuously at high capacity. This is because their power output cannot efficiently be ramped up and down on a daily and weekly basis, and in this respect they are similar to most coal-fired plants. (It is also uneconomic to run them at less than full capacity, since they are expensive to build but cheap to run.) However, in some situations it is necessary to vary the output according to daily and weekly load cycles on a regular basis, for instance in France, where there is a very high reliance on nuclear power.
BWRs can be made to follow loads reasonably easily without burning the core unevenly, by changing the coolant flow rate. Load following is not as readily achieved in a PWR, but especially in France since 1981, so-called 'grey' control rods are used. The ability of a PWR to run at less than full power for much of the time depends on whether it is in the early part of its 18 to 24-month refuelling cycle or late in it, and whether it is designed with special control rods which diminish power levels throughout the core without shutting it down. Thus, though the ability on any individual PWR reactor to run on a sustained basis at low power decreases markedly as it progresses through the refueling cycle, there is considerable scope for running a fleet of reactors in load-following mode. European Utility Requirements (EUR) since 2001 specify that new reactor designs must be capable of load-following between 50 and 100% of capacity with a rate of change of electric output of 3-5% per minute. The economic consequences are mainly due to diminished load factor of a capital-intensive plant. Further information in the
Nuclear Power in France paper and the 2011 Nuclear Energy Agency report,
Technical and Economic Aspects of Load Following with Nuclear Power Plants.
As fast neutron reactors become established in future years, their ability to load-follow will be a benefit.